Facilities are the places at your property that are not rooms: the pool, the kitchen, the boiler room, the roof. Maintenance plans checks and work orders on them, and subscriptions sell access to the same places, so each place is entered once. Check plans are the recurring checks, such as a daily pool water test, that HotelBee turns into tasks on the right day.

Add your facilities

  1. Open Operations → Facilities (also under Experiences → Facilities) and click Create New.
  2. Enter the Name and leave Active on.
  3. Set Type to Physical place for a real place. Virtual (subscriptions only) is for things like a day pass and never shows in maintenance.
  4. Pick the Kind of place (guest areas, back of house, building and grounds) and, if it sits in a bigger place, the place under Inside.
  5. For technical places (boiler room, roof) switch off In subscriptions, so subscription plans and kiosks don't offer them. Icon, Color and Order only change how subscriptions show the place.

Rooms are never listed here; they are places already. Event venues from Experiences → Venues can be picked as places too. A facility can't be deleted while a place inside it, a subscription plan, a kiosk, a check plan or open work uses it.

Facility form for a boiler room as a physical technical place inside the main building

Set up a check plan

  1. Open Operations → Maintenance → Check plans and click New check plan.
  2. Pick a template (Pool water check, Fire extinguishers, AC filter cleaning, Water temperatures (legionella) and more) or Blank plan.
  3. Under Where, pick a Location or Rooms. For rooms choose All rooms, Rooms of some room types or Picked rooms. Rooms per day spreads a big round (AC filters in 80 rooms) over several days.
  4. Under How often, set Repeats (every N days, weekly, monthly or yearly), the hour and the Start date. Overdue after (minutes) is the grace period.
  5. Build the Checklist: each item is a Tick box, Reading (number) with a unit and Min / Max, Text or Photo. Mark items Required or Photo required.
  6. Pick who gets the checks in Assign checks to and what happens When a reading is out of range: Open a high-priority work order and notify managers, or Notify managers only.
  7. Click Save.
New check plan from the Pool water check template

Do a check

Each check appears in Open work on its day. Open it, fill in the checklist and click Complete check. Required items must be filled. A reading outside its range is marked Out of range and runs the plan's rule.

Good to know

  • Creating plans needs the Maintenance check plans rights. Create checks now on a plan makes today's checks at once.
  • Late checks notify the assignees and the managers.
  • Print a blank Check log sheet from a plan to pin up at the place.
  • Done checks go to the Journal. Reports → Housekeeping & maintenance → Facility compliance shows how plans were kept.
  • For repairs, see "Maintenance: work orders and the maintenance calendar".