/Help Center
End user

Maintenance: work orders and the maintenance calendar

Verified Nov 11, 20262 min read

A work order is one repair: a dripping tap in Room 101, a broken pool light. HotelBee follows it from report to repair and can take the room off sale meanwhile. Maintenance comes with the Housekeeping add-on and is under Operations → Maintenance.

Report a problem

  1. Click New work order on Operations → Maintenance. Housekeepers can also click Report an issue (the wrench) on a room card in Housekeeping, and the front desk can click Create work order on a guest issue.
  2. Choose Room, Location or Venue, pick the place and a Category. The title fills in by itself (for example "Plumbing – Room 101"); change it in What is the problem? if you like.
  3. Pick a priority: Low, Normal, High or Urgent. Leave Due empty and it follows the priority: urgent 2 hours, high 24 hours, normal 3 days, low 7 days.
  4. Add a Description, Photos and the people under Assigned to. You can also type the name of an outside worker who has no HotelBee account; they are shown on the work order but get no notification.
  5. If guests can't use the room, switch on Take the room out of service and set Out of service from and Back in service on. This needs the Reservations Create right.
  6. Click Create work order.

Assigned staff get a notification. Urgent work orders also notify the maintenance managers. A work order with someone assigned moves from Open to Assigned on its own.

New work order form with Room 103, Plumbing, High priority and the room taken out of service

Work on it

  1. Open the work order from Open work. Use Assign to me to take it and Start when you begin (On hold and Resume for parts or access).
  2. Fill in Work and cost: Minutes worked, Vendor and Vendor cost, Parts used and What was done. Add Before and After photos and notes.
  3. Click Mark complete. The status is Done.
  4. A manager with the View All right checks it and clicks Verify. Reopen brings back a job that isn't fixed.
Open work order in progress with Work and cost filled in

The board

Open work shows every open work order and check, overdue first, then by priority. Filter with Mine + unassigned, Assigned to me or All, and with Work orders or Checks. The print button gives a Work list with tick boxes or Work orders, one per page to hand out.

The maintenance calendar

Operations → Maintenance Calendar shows open work orders and checks at their due time, planned checks with a dashed outline and overdue work in red. Switch on Show completed to see finished work. Click a day to start a work order due that day.

Maintenance calendar month view with work orders, planned checks and an overdue item

The journal

The Journal tab lists finished work orders and checks with the date, place, who did it and the time spent. To record work that was done without a work order or plan (for example "Pool cleaned"), click Log entry.

Good to know

  • Deleting a work order deletes its history. Use Cancel task for work that won't be done.
  • The Work orders report is in Reports → Housekeeping & maintenance.
  • Recurring checks such as pool tests are set up as check plans. See "Facilities and checks".

Related articles